Insights  ·  Forced labour

The largest UFLPA expansion yet reaches aluminium and copper.

If your products contain aluminium or copper, US forced-labour rules may now reach them. Forty-three companies joined the UFLPA Entity List in August, taking it to 187, which brings transformer, cable and busbar supply chains into scope.

On 31 July the US Department of Homeland Security added 43 companies to the Uyghur Forced Labor Prevention Act Entity List, effective 3 August. It was the largest single addition since the list began, and it took the total to 187 entities.

The products named matter more than the count. Alongside cotton, apparel and tomatoes, the additions cover aluminium and copper. Those are not textile risks. They are the metals inside transformers, switchgear, cable and busbar, which is to say inside every data-centre build and grid connection now under way.

If you are about to commit to a supplier

Supplier Risk Check · Fixed fee · 3 working days. Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

Location matters too. Most of the new names are in Xinjiang, but several are based elsewhere in China, including Shandong, Jiangsu and Henan. A buyer who screens only for Xinjiang addresses will miss them.

Why it reaches UK and European suppliers

The UFLPA presumes that goods made wholly or partly by a listed entity, or in Xinjiang, are made with forced labour. US Customs can detain them at the border, and the importer has to rebut the presumption with evidence. A UK manufacturer that sells finished equipment into the US is exposed if any input, at any tier, traces back to a listed company.

The European Union’s own forced labour ban applies from December 2027. Buyers are already asking for the same evidence now, so that they are not caught when it does.

What a buyer will ask for

  • Where the aluminium and copper in your product were smelted and refined, by name.
  • Whether any supplier, at any tier, is on the Entity List or owned by an entity that is.
  • Documents that trace the metal from smelter to your factory, not a declaration that it is “conflict-free”.

A supplier code that says “we do not use forced labour” does not answer any of these. Evidence of origin does.

What to do now

  1. Map the metals. List every product that contains aluminium or copper, and the supplier of each.
  2. Screen the chain, not just the counterparty. Check direct suppliers and their owners against the current Entity List, then ask for smelter names.
  3. Close the gaps in writing. Where a supplier cannot name a smelter, record the request and the answer. A documented gap is defensible; an unasked question is not.

The list will keep growing. The cost of answering these questions rises sharply once goods are detained, so the time to collect the evidence is before the next shipment.

A defined first step. Start this week.

For decisions with a date on them. Fixed scope and fixed fee. Request one and we reply the same working day with the fee and a start date.

If you are about to commit to a supplier

Supplier Risk Check

Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

Fixed fee3 working days
Request this

If a customer has sent an EUDR or CBAM questionnaire

Customer Questionnaire Response

Send your customer a complete answer they will accept, with the evidence behind each reply. Up to 40 questions.

Fixed fee5 working days
Request this

Every other engagement is scoped to the matter. Send it over and we reply with scope, fee and timeline the same working day.

Fees are fixed and confirmed in writing before work starts. For business customers. Reviews report evidence; legal advice, licence applications and filings remain with your counsel. Terms of sale

Next step

Have a question with a date on it?

A bid, an audit, a counterparty or a contract. Send it over and we reply the same working day with scope, fee and timeline.

Container port elevation A densely detailed front-elevation line drawing of a container port in brass on deep navy. A large container ship with a raked bow, hull plating, draft marks and an accommodation block carries eleven bays of stacked containers. Two ship-to-shore gantry cranes stand on the quay: one with its latticed boom lowered over the ship, a trolley and a container suspended on the spreader, the other with its boom raised. To the right a rail-mounted gantry spans stacked yard containers. Water is drawn as layered wave lines with reflections; the quay carries crane rails, bollards, fenders and mooring lines.
Container terminal · Elevation