Sectors  /  05

Data centres & robotics

We give suppliers to data-centre and robotics projects the material-origin and ownership evidence their customers now require, and help new suppliers find a way in.

Switchgear hall
The situation

What is changing, and what it means for you.

01

What is changing

  • Hyperscaler supplier codes now ask for material origin, forced-labour and conflict-minerals evidence from equipment suppliers.
  • US export rules on advanced computing reach the hardware and its end users.
  • EU battery rules require due diligence on cobalt, lithium, nickel and graphite.
02

Who it affects

Equipment suppliers already on hyperscale projects, manufacturers trying to enter the market, the contractors who build and onboard suppliers, and makers of robots and humanoids.

03

The problem it creates

A supplier already on projects is asked to prove where the copper, aluminium, steel and battery materials came from. A manufacturer trying to enter has the opposite problem: it does not know which projects, contractors or requirements to aim at.

04

What Meridian does

For suppliers on projects we build the origin and control file the customer’s code asks for. For new entrants we map the projects, contractors and qualification requirements. For contractors we apply one evidence standard across the supply base.

Where to start

Different businesses, different first steps.

Each starts with a defined scope and a fixed fee, set out in writing the same working day.

If you are

Already supplying hyperscale projects

Your customer’s supplier code asks for material-origin evidence you do not hold.

You receive: Copper, aluminium, steel and battery materials traced towards source, ownership checked, and answers mapped to the code.

Origin and control fileStart here →

If you are

Trying to enter the market

You can make the equipment but do not know which projects or contractors to approach.

You receive: Current and planned projects, the contractors and tier-one suppliers on each, and what they require before qualifying you.

Pipeline and route-inStart here →

Not sure which fits? Describe the situation

Specimen · Supply Chain Risk Review

See what a finished review looks like.

Twelve pages from a review of a 60-supplier panel ahead of a hyperscaler supplier-code audit: the decision, the heat map, the screening, the risks and the sources behind them. The client, the suppliers and the findings are fictional.

You will also receive our Insights by email. Unsubscribe at any time. Privacy notice.

01

The specimen is ready. Download it now. We have also sent you an email: confirm your address there to receive future insights.

Is a customer audit, supplier code or tender asking about your suppliers?

Tell us about your panel. We reply the same working day with scope, fee and timeline.

Specimen · Your situation

A few answers are enough to start.

What is asking? Optional

Sent in confidence. Used only to reply to you.

02

Then keep the specimen for when it does. Most panel reviews start with a customer’s question and a deadline. When yours arrives, reply to any of our emails.

Download the specimen again

A defined first step. Start this week.

For decisions with a date on them. Fixed scope and fixed fee. Request one and we reply the same working day with the fee and a start date.

If you are about to commit to a supplier

Supplier Risk Check

Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

Fixed fee3 working days
Request this

If a customer has sent an EUDR or CBAM questionnaire

Customer Questionnaire Response

Send your customer a complete answer they will accept, with the evidence behind each reply. Up to 40 questions.

Fixed fee5 working days
Request this

Every other engagement is scoped to the matter. Send it over and we reply with scope, fee and timeline the same working day.

Fees are fixed and confirmed in writing before work starts. For business customers. Reviews report evidence; legal advice, licence applications and filings remain with your counsel. Terms of sale

What we test

Three questions, answered with evidence.

01Equipment and EPC supplier assurance
02Humanoid and robotics supply chains
03Material tracing, component to mine
Line drawing: Data centre · campus section010203
Data centre · campus sectionDrawing · not to scale
Under inspection

What we read.

  1. PowerTransformer and switchgear metals: copper and aluminium origin under the UFLPA.
  2. CoolingChiller components and F-gas compliance.
  3. Compute hallsEAR advanced-computing rules on the hardware and its end user.
Standards

Standards & regulation.

The frameworks buyers in this sector ask about most.

UFLPA · EU Batteries Regulation · OECD Due Diligence Guidance · EAR

All frameworks we work to →

Next step

Have a question with a date on it?

A bid, an audit, a counterparty or a contract. Send it over and we reply the same working day with scope, fee and timeline.

Container port elevation A densely detailed front-elevation line drawing of a container port in brass on deep navy. A large container ship with a raked bow, hull plating, draft marks and an accommodation block carries eleven bays of stacked containers. Two ship-to-shore gantry cranes stand on the quay: one with its latticed boom lowered over the ship, a trolley and a container suspended on the spreader, the other with its boom raised. To the right a rail-mounted gantry spans stacked yard containers. Water is drawn as layered wave lines with reflections; the quay carries crane rails, bollards, fenders and mooring lines.
Container terminal · Elevation