Where was your transformer made? Data centre buyers are starting to ask.

Power equipment is now the slowest part of a data centre build, and much of the steel and copper inside it comes from China. Hyperscalers, lenders and, soon, UK regulators will want to know where a transformer came from and who made it. Suppliers who can show that are better placed to win the order.

Industrial sheds and stockpiles behind a fence under heavy rain clouds

Data centre timetables now depend on electrical equipment more than on land or finance. Lead times for large transformers have stretched to around three years, and buyers are taking capacity wherever they can find it.

That brings a second question with every order: where was this made, and from what? Most hyperscalers are US companies, and their supplier codes tend to carry US expectations wherever they build. A transformer for a site in Slough or Dublin can face the same questions as one for Virginia.

If you are about to quote for a data centre package

Supplier Risk Check · Fixed fee · 3 working days. Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

The steel inside the transformer

Every power transformer has a core of grain-oriented electrical steel. In the EU, local mills’ share of that market has fallen from 66 to 43 per cent, and more than half of imports now come from China. In March the European Commission opened a safeguard investigation into imports of this steel and of finished transformer cores.

A transformer assembled in Europe can still carry a Chinese core. The buyer will want to know which.

Rows of stainless steel equipment and cabling in an industrial hall

The copper in the windings

Copper is now on the forced labour enforcement map. In August the US added 43 companies to its forced labour Entity List, including copper producers. In June US Customs issued an order holding copper from a producer in Serbia at the border over forced labour concerns. Moving production to a friendly country does not put it out of reach.

Read our earlier insight on the UFLPA expansion into aluminium and copper.

UK regulation is coming

The Cyber Security and Resilience Bill brings data centres of 1MW and above into regulation, with Ofcom as regulator. It also lets regulators name critical suppliers, which could bring providers of power, cooling and security equipment into scope directly. The Bill is in the House of Lords, and most duties will follow in secondary legislation.

Its focus is security and resilience, not origin. But regulators will be able to look at who a data centre depends on, and the ownership and origin of critical equipment are part of that picture.

What to check before your next tender

  1. Name the maker. For each transformer, switchgear panel and UPS you supply, record who made it, not only who sold it to you.
  2. Trace the materials. Ask where the core steel and the copper windings came from, and check whether the steel mill or copper smelter, or its owner, is on a US, UK or EU list.
  3. Trace the owners. Follow each manufacturer’s ownership to the top.
  4. Read the contract. Check what happens if a shipment is held at a border.

A supplier who can answer these in one document is easier to approve, and faster to pay.

A bright factory hall with a steel frame suspended from an overhead crane

Where we come in

Meridian Intermediaries gives you one file you can hand to a hyperscaler, an EPC contractor or a lender. It shows:

  • who made each item of equipment, and who owns them;
  • where the steel and copper came from;
  • the list status of every party, with a source and a confidence grade for each fact.

Quoting for a data centre package? Request a Supplier Risk Check → or speak to us first.

A defined first step. Start this week.

For decisions with a date on them. Fixed scope and fixed fee. Request one and we reply the same working day with the fee and a start date.

If you are about to commit to a supplier

Supplier Risk Check

Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

Fixed fee3 working days
Request this

If a customer has sent a supplier questionnaire

Customer Questionnaire Response

Send your customer a complete answer they will accept, with the evidence behind each reply. Up to 40 questions.

Fixed fee5 working days
Request this

Every other engagement is scoped to the matter. Send it over and we reply with scope, fee and timeline the same working day.

Fees are fixed and confirmed in writing before work starts. For business customers. Reviews report evidence; legal advice, licence applications and filings remain with your counsel. Terms of sale

Next step

Have a question with a date on it?

A bid, an audit, a counterparty or a contract. Send it over and we reply the same working day with scope, fee and timeline.

Container port elevation A densely detailed front-elevation line drawing of a container port in brass on deep navy. A large container ship with a raked bow, hull plating, draft marks and an accommodation block carries eleven bays of stacked containers. Two ship-to-shore gantry cranes stand on the quay: one with its latticed boom lowered over the ship, a trolley and a container suspended on the spreader, the other with its boom raised. To the right a rail-mounted gantry spans stacked yard containers. Water is drawn as layered wave lines with reflections; the quay carries crane rails, bollards, fenders and mooring lines.
Container terminal · Elevation