Insights  ·  Critical minerals

Selling tin, tantalum or tungsten to a smelter: the file decides who buys.

Since June, smelters have had more reason to question the mines that supply them. Smuggled coltan reached audited supply chains, and from 1 January 2027 US defence contracts refuse tantalum and tungsten mined in China. Mines that can prove where each lot came from are the ones smelters can buy from.

Smelters of tin, tantalum and tungsten have more reason than ever to question the mines that supply them. On 10 June 2026 Global Witness reported that five of Rwanda’s seven largest coltan exporters had bought ore smuggled from M23-held mines. From 1 January 2027 US defence contracts stop accepting tantalum and tungsten mined in China.

For a mine outside China and outside the conflict zone, this is an opening. Smelters need ore they can defend to their customers and auditors. The mines that win the sale are the ones that can show where every lot came from. That holds wherever the mine is, from Bolivia and Brazil to Rwanda, Indonesia and Portugal.

Haul truck carrying ore along an open-pit mine road
A smelter checks the route from pit to plant, not only the export papers.

What changed this year

  • Smuggled coltan reached audited supply chains. Global Witness traced ore from Rubaya in eastern DRC, which it says supplies about 15% of the world’s coltan. It found the ore sold through Rwandan exporters to smelters in China and Kazakhstan. ITSCI and the exporters named dispute the findings.
  • The auditor responded the same day. The Responsible Minerals Initiative runs the RMAP smelter audits. It said it would follow up the allegations, and pointed smelters to its enhanced due diligence on Great Lakes material.
  • Some buyers stepped back from the region. Apple told Global Witness it had asked its suppliers’ smelters to suspend 3T and gold purchases from the DRC and Rwanda. Lawful mines nearby lose sales unless they can prove their origin.
  • US defence supply chains reach the mine. From 1 January 2027, DFARS 252.225-7052 bars tantalum and tungsten mined or refined in China, Russia, North Korea or Iran from US defence deliveries. China mined almost four-fifths of the world’s tungsten in 2025.
  • Tin brands go on public record. From 2027 the London Metal Exchange will publish the red flag assessments filed under its Track C by brand name. A smelter’s choice of suppliers becomes visible.

What a smelter checks before it buys

Smelters audited under RMAP work to the OECD Due Diligence Guidance and its Supplement on Tin, Tantalum and Tungsten. So do EU importers under the Conflict Minerals Regulation, which recognised RMAP’s 3T standards in October 2025. For a mine, the questions come down to four.

  • Who owns and runs the mine? Mining and export licences, company registration and every owner and controller, each one screened.
  • Where exactly does the ore come from? The mine’s location and production records, and proof of origin for each lot, matched to tonnage and grade.
  • How does it travel? Every handler, warehouse and border crossing between the mine and the smelter, with the documents for each.
  • Who is paid along the way? Taxes, royalties and security payments, and whether any armed group or security force benefits.

Where the answers touch a conflict-affected or high-risk area, the smelter must carry out enhanced checks. These include assessing the mine and the route on the ground.

Not every smelter works to the same scheme

The questions are the same everywhere. The rulebook depends on who buys your ore.

  • RMAP. The Responsible Minerals Initiative audits tin, tantalum and tungsten smelters that supply electronics, cars and industry. Its 3T standards were the first the EU recognised under the Conflict Minerals Regulation.
  • Tin Code. The International Tin Association runs its own assurance process for tin smelters, built on the same OECD guidance.
  • LME. Tin brands listed on the London Metal Exchange must meet its responsible sourcing rules, through a recognised standard or a red flag assessment.
  • EU and US law. EU importers of 3T ores and metals must carry out due diligence on their supply chains. In the US, Dodd-Frank section 1502 requires listed companies to report on 3T from the DRC and its neighbours.
  • ITSCI and Better Mining. These upstream programmes tag and trace material at mine sites in the Great Lakes region. They support a smelter’s checks but do not replace them.

If you sell to an electronics smelter, a tin brand on the LME or an importer in Europe, the file is the same; the rulebook differs.

Why a tag is not a file

A traceability tag shows that a bag was sealed at a site. It does not show who owns the mine, how the ore was paid for, or whether the tonnage is plausible for that site. After the Rubaya findings, smelters have every reason to read behind the tag.

The same applies to tungsten bought for US defence work. A buyer will want proof of the mine, not just the country on the export permit.

The cost of an incomplete file

A smelter that cannot complete its checks cannot buy from you. The ore still sells, but through traders, usually on weaker terms and with slower payment. Each intermediary takes a margin that a direct seller keeps.

Five questions to answer before you approach a smelter

  • Can you show everyone who owns or controls the mine, through every holding company, and has each one been screened?
  • Are your mining and export licences current, and held by the company that sells the ore?
  • Can you match each lot’s tonnage and grade to recorded production at the mine?
  • Can you show every handler and border crossing between the mine and the smelter?
  • Do all payments, taxes and royalties go through banks, and can you evidence them?

If any answer is "not yet", it is better found now than in the smelter’s first round of questions.

For mines selling concentrate · RMAP, Tin Code, LME or EU smelters

Refiner-Ready File · Fixed fee · About 4 weeks. The file an accredited refiner or smelter needs to onboard your mine, in the order its compliance team reads it. Starts with a readiness check, credited in full.

A sensible first step

We build the file a smelter’s compliance team needs, in the order it reads it, against the OECD 3T Supplement and the smelter’s own scheme. Every statement is tied to a document, its source and its date. Page one carries a plain rating: ready to submit, ready with named gaps, or not yet submittable.

It starts with a readiness check against your target smelter’s requirements, in five working days. The fee is fixed and confirmed on the first call. We do not certify mines, replace a smelter’s own assessment, or handle ore.

Selling tin, tantalum or tungsten concentrate to a smelter? Request this file → or speak to us first.

Before January. Get smelter-ready.

For decisions with a date on them. Fixed scope and fixed fee. Request one and we reply the same working day with the fee and a start date.

If you sell concentrate through traders because a smelter cannot yet verify you

Refiner-Ready File

The file an accredited refiner or smelter needs to onboard your mine, in the order its compliance team reads it. Starts with a readiness check, credited in full.

Fixed feeAbout 4 weeks
Request this file

If you buy concentrate from mines or traders near the Great Lakes

Supplier Risk Check

Know before you sign whether a supplier, or anyone who owns it, is sanctioned or on a forced-labour list. Two pages.

Fixed fee3 working days
Request this

Every other engagement is scoped to the matter. Send it over and we reply with scope, fee and timeline the same working day.

Fees are fixed and confirmed in writing before work starts. For business customers. Reviews report evidence; legal advice, licence applications and filings remain with your counsel. Terms of sale

Next step

Have a question with a date on it?

A bid, an audit, a counterparty or a contract. Send it over and we reply the same working day with scope, fee and timeline.

Container port elevation A densely detailed front-elevation line drawing of a container port in brass on deep navy. A large container ship with a raked bow, hull plating, draft marks and an accommodation block carries eleven bays of stacked containers. Two ship-to-shore gantry cranes stand on the quay: one with its latticed boom lowered over the ship, a trolley and a container suspended on the spreader, the other with its boom raised. To the right a rail-mounted gantry spans stacked yard containers. Water is drawn as layered wave lines with reflections; the quay carries crane rails, bollards, fenders and mooring lines.
Container terminal · Elevation